Falsework

Term from Construction industry explained for recruiters

Falsework is a temporary support structure used in construction to hold up building materials, like concrete, until they become strong enough to support themselves. Think of it like the temporary scaffolding that helps hold up a bridge or building while it's being built. Once the concrete or other materials have fully hardened, the falsework is removed. This is different from scaffolding, which is mainly used to help workers access different heights - falsework actually bears the weight of the construction materials themselves.

Examples in Resumes

Supervised installation and removal of Falsework systems for major highway bridge construction

Managed safety protocols for Falsework and temporary support structures on multiple commercial projects

Designed and implemented Temporary Support and Falsework solutions for complex concrete pours

Typical job title: "Falsework Engineers"

Also try searching for:

Temporary Works Engineer Construction Engineer Formwork Engineer Structural Engineer Civil Engineer Construction Supervisor Site Engineer

Example Interview Questions

Senior Level Questions

Q: How do you ensure the safety of a large-scale falsework installation?

Expected Answer: A senior candidate should discuss risk assessment, load calculations, regular inspections, weather considerations, and having clear safety protocols and emergency procedures in place. They should mention documentation requirements and coordination with other construction activities.

Q: Describe a challenging falsework project you've managed and how you solved any problems.

Expected Answer: Look for answers that demonstrate leadership, problem-solving abilities, and understanding of both technical and practical aspects of falsework installation. They should discuss coordination with different teams and handling unexpected issues.

Mid Level Questions

Q: What factors do you consider when planning falsework removal?

Expected Answer: Candidate should mention concrete strength testing, proper removal sequence, safety measures, and timing considerations. They should understand the importance of gradual removal to prevent structure damage.

Q: How do you calculate load requirements for falsework?

Expected Answer: Should be able to explain basic load calculations, including dead load, live load, and environmental factors like wind and rain. Should mention the importance of safety factors and following design specifications.

Junior Level Questions

Q: What are the main components of a typical falsework system?

Expected Answer: Should be able to identify basic components like vertical supports, horizontal beams, bracing, and adjustment mechanisms. Should understand how these parts work together.

Q: What safety checks do you perform before and during falsework use?

Expected Answer: Should mention daily visual inspections, checking for proper assembly, monitoring for movement or settlement, and ensuring proper documentation is maintained.

Experience Level Indicators

Junior (0-2 years)

  • Basic understanding of falsework components
  • Ability to follow safety procedures
  • Reading construction drawings
  • Basic inspection duties

Mid (2-5 years)

  • Falsework installation supervision
  • Safety protocol implementation
  • Basic load calculations
  • Construction sequence planning

Senior (5+ years)

  • Complex falsework design review
  • Project management
  • Risk assessment
  • Team leadership and training

Red Flags to Watch For

  • No knowledge of basic safety requirements
  • Unfamiliar with load calculation principles
  • Lack of experience with construction documentation
  • Poor understanding of concrete curing times and strength requirements