Design-Bid-Build is the traditional way of handling construction projects, where the process happens in three clear steps. First, architects and engineers create the complete design. Then, contractors look at these plans and submit their bids for the work. Finally, the chosen contractor builds the project. Think of it like planning a wedding - first you design everything with a planner, then you get price quotes from vendors, and finally you pick one to do the work. It's different from newer methods like Design-Build, where one company handles everything from start to finish.

Examples in Resumes

Managed 5 Design-Bid-Build projects with total value of $10M

Successfully completed 3 commercial buildings using the Design-Bid-Build delivery method

Coordinated between architects and contractors on multiple Design-Bid-Build projects

Reduced costs by 15% on DBB projects through efficient bid management

Typical job title: "Construction Project Managers"

Also try searching for:

Construction Manager Project Manager General Contractor Construction Supervisor Bid Manager Construction Coordinator Project Coordinator

Example Interview Questions

Senior Level Questions

Q: How do you handle conflicts between designers and contractors in a Design-Bid-Build project?

Expected Answer: A senior manager should explain their approach to conflict resolution, including regular communication meetings, clear documentation processes, and experience in finding compromises that keep projects on track while maintaining quality and budget.

Q: What strategies do you use to prevent cost overruns in Design-Bid-Build projects?

Expected Answer: Should discuss thorough bid review processes, importance of complete design documents, change order management, and regular budget monitoring throughout the project lifecycle.

Mid Level Questions

Q: What are the key differences between Design-Bid-Build and Design-Build approaches?

Expected Answer: Should be able to explain that Design-Bid-Build separates design and construction phases with different companies, while Design-Build uses one company for both, and discuss the pros and cons of each.

Q: How do you ensure quality control in a Design-Bid-Build project?

Expected Answer: Should mention regular inspections, documentation requirements, communication with architects/engineers, and following specifications exactly as designed.

Junior Level Questions

Q: Can you explain the basic steps in a Design-Bid-Build project?

Expected Answer: Should describe the three main phases: design completion by architects/engineers, contractor bidding process, and construction phase, with basic understanding of what happens in each step.

Q: What documents are typically included in a bid package?

Expected Answer: Should list basic items like drawings, specifications, bid form, schedule requirements, and general conditions of the contract.

Experience Level Indicators

Junior (0-3 years)

  • Understanding of basic construction documents
  • Ability to read and understand project plans
  • Basic knowledge of bidding processes
  • Familiarity with construction scheduling

Mid (3-7 years)

  • Bid package preparation and analysis
  • Contract administration
  • Subcontractor coordination
  • Budget and schedule management

Senior (7+ years)

  • Complex project management
  • Risk assessment and mitigation
  • Multiple project coordination
  • Strategic planning and team leadership

Red Flags to Watch For

  • No experience with construction documentation
  • Lack of understanding of bidding procedures
  • Poor communication skills
  • No knowledge of construction scheduling
  • Unable to read architectural drawings