AGC

Term from Power Systems industry explained for recruiters

AGC (Automatic Generation Control) is a crucial system used in power plants and electrical grids to automatically adjust power generation based on demand. Think of it like a smart thermostat for the power grid - it helps keep the perfect balance between how much electricity is being made and how much is being used. This is important because power grids need to maintain a steady electrical frequency and reliable power supply. When you see AGC on a resume, it often indicates experience with power plant operations or grid control systems.

Examples in Resumes

Implemented AGC systems for three regional power plants

Monitored and maintained Automatic Generation Control systems across multiple generating units

Led team responsible for upgrading legacy AGC software to modern control systems

Typical job title: "Power Systems Engineers"

Also try searching for:

Power Plant Engineer Control Systems Engineer Electrical Engineer Generation Engineer Grid Control Engineer SCADA Engineer Power Systems Specialist

Example Interview Questions

Senior Level Questions

Q: Can you explain how you would manage an AGC system upgrade project?

Expected Answer: A strong answer should cover project planning, risk assessment, coordination with different departments, minimizing power disruption, and ensuring system reliability throughout the upgrade process.

Q: How would you handle a situation where the AGC system is not responding correctly to load changes?

Expected Answer: Look for answers that demonstrate troubleshooting expertise, understanding of power system stability, and ability to make quick decisions while maintaining grid reliability.

Mid Level Questions

Q: What factors affect AGC performance in a power plant?

Expected Answer: Candidate should mention things like generator response time, communication systems, load variations, and weather conditions in simple terms.

Q: How do you ensure proper coordination between AGC and other control systems?

Expected Answer: Answer should show understanding of how different control systems work together and the importance of proper system integration.

Junior Level Questions

Q: What is the basic purpose of an AGC system?

Expected Answer: Should be able to explain that AGC helps maintain balance between power generation and consumption in simple terms.

Q: What basic measurements does an AGC system monitor?

Expected Answer: Should mention power output, frequency, and tie-line flows in understandable terms.

Experience Level Indicators

Junior (0-2 years)

  • Basic understanding of power systems
  • Monitoring AGC operations
  • Reading control system displays
  • Basic troubleshooting

Mid (2-5 years)

  • AGC system maintenance
  • Performance monitoring
  • System adjustments
  • Coordination with operators

Senior (5+ years)

  • System design and upgrades
  • Project management
  • Advanced troubleshooting
  • Team leadership

Red Flags to Watch For

  • No understanding of basic power system concepts
  • Lack of experience with control room operations
  • No knowledge of grid reliability standards
  • Poor understanding of safety procedures

Related Terms