Strike Line

Term from Geological Surveying industry explained for recruiters

A Strike Line is a basic but important concept in geological surveying that helps determine how rock layers are positioned in the ground. Think of it like drawing a line on a tilted book - the Strike Line shows which way the rocks are oriented and helps geologists understand the structure beneath the surface. This information is crucial for mining operations, construction projects, and resource exploration. When you see this term in resumes, it often indicates that the candidate has experience in field mapping and understanding geological structures.

Examples in Resumes

Conducted field surveys to map Strike Line patterns across 3 mining sites

Used modern GPS equipment to accurately record Strike Lines and dip measurements

Trained junior geologists in proper Strike Line measurement techniques

Typical job title: "Geological Surveyors"

Also try searching for:

Field Geologist Geological Surveyor Mining Geologist Exploration Geologist Structural Geologist Field Mapper Geological Field Technician

Example Interview Questions

Senior Level Questions

Q: How do you ensure accuracy when measuring strike lines in challenging terrain?

Expected Answer: A senior candidate should discuss multiple measurement techniques, error correction methods, and how to handle difficult field conditions. They should also mention training others and quality control procedures.

Q: How do strike line measurements influence project planning in mining operations?

Expected Answer: The answer should cover how strike line data affects safety considerations, resource estimation, and construction planning, demonstrating leadership experience in making key project decisions.

Mid Level Questions

Q: What tools do you use to measure and record strike lines?

Expected Answer: Should be able to describe various tools like compasses, GPS devices, and mapping software, explaining when to use each one and how to ensure accurate readings.

Q: How do you document strike line measurements in field reports?

Expected Answer: Should explain proper documentation methods, including field notes, digital recording, and how to present the data in readable formats for non-technical team members.

Junior Level Questions

Q: Can you explain what a strike line is and why it's important?

Expected Answer: Should be able to give a basic explanation of strike lines as the direction of level lines in rock layers and explain their basic importance in geological mapping.

Q: What safety considerations do you take when measuring strike lines in the field?

Expected Answer: Should demonstrate awareness of basic field safety protocols, proper use of equipment, and when to seek assistance from senior team members.

Experience Level Indicators

Junior (0-2 years)

  • Basic field measurement techniques
  • Use of geological compass
  • Field note taking
  • Basic mapping skills

Mid (2-5 years)

  • Advanced measurement techniques
  • Digital mapping tools
  • Data analysis and interpretation
  • Field team coordination

Senior (5+ years)

  • Project planning and management
  • Quality control procedures
  • Training and mentoring
  • Complex geological interpretation

Red Flags to Watch For

  • Unable to explain basic measurement techniques
  • No field experience
  • Lack of safety awareness
  • Poor documentation skills
  • No experience with geological mapping tools