Setting Plan

Term from Modular Construction industry explained for recruiters

A Setting Plan is a detailed blueprint or map that shows exactly how modular building units should be placed and connected at a construction site. Think of it like a very precise instruction manual that tells crane operators and construction teams where each pre-built room or section needs to go. This plan includes important details like the order of installation, where the crane should be positioned, and how the modules connect to each other. It's similar to putting together a large piece of furniture, but on a much bigger scale for entire buildings. Construction managers use Setting Plans to make sure everything fits perfectly and safely during assembly.

Examples in Resumes

Created and implemented Setting Plan for 50-unit apartment complex, reducing installation time by 30%

Supervised construction team using Setting Plan and Module Layout Plan for medical facility installation

Developed detailed Setting Plans for multiple story commercial buildings

Typical job title: "Setting Plan Coordinators"

Also try searching for:

Modular Construction Coordinator Installation Planner Setting Plan Designer Construction Layout Specialist Modular Building Planner Assembly Coordinator

Example Interview Questions

Senior Level Questions

Q: How would you handle a situation where module dimensions don't match the setting plan on-site?

Expected Answer: A senior coordinator should discuss their problem-solving approach, including reviewing original plans, coordinating with factory and site teams, and developing quick solutions while minimizing project delays and costs.

Q: What factors do you consider when creating a setting plan for a multi-story modular building?

Expected Answer: Should mention considerations like site access, crane reach and capacity, module connection points, weather conditions, safety requirements, and coordination with various trades.

Mid Level Questions

Q: How do you ensure proper module alignment during the setting process?

Expected Answer: Should explain the importance of survey points, reference marks, and the use of proper measuring techniques, as well as coordination with crane operators and ground crew.

Q: What information must be included in a complete setting plan?

Expected Answer: Should list key elements like module numbers, setting sequence, crane positions, connection details, and site preparation requirements.

Junior Level Questions

Q: What is the purpose of a setting plan?

Expected Answer: Should explain that it's a guide for placing modular units in the correct position and sequence, ensuring proper building assembly.

Q: What safety considerations are important when following a setting plan?

Expected Answer: Should discuss basic safety measures like checking weather conditions, ensuring proper communication between team members, and following crane operation protocols.

Experience Level Indicators

Junior (0-2 years)

  • Basic understanding of construction drawings
  • Knowledge of modular building components
  • Ability to read and interpret setting plans
  • Basic safety awareness

Mid (2-5 years)

  • Creating basic setting plans
  • Coordination with crane operators
  • Understanding of building codes
  • Problem-solving during installation

Senior (5+ years)

  • Complex project planning
  • Team leadership and coordination
  • Advanced problem-solving
  • Quality control management

Red Flags to Watch For

  • No experience with modular construction methods
  • Lack of understanding of crane operations and lifting requirements
  • Unable to read construction drawings
  • No knowledge of building codes and safety regulations
  • Poor communication skills