Rough-In

Term from Plumbing industry explained for recruiters

Rough-in is an important early stage in plumbing work where plumbers install the basic pipe system before walls and floors are finished. It's like creating the skeleton of the plumbing system - putting in pipes, vents, and drain lines, but not yet installing the visible fixtures like sinks or toilets. This stage needs to be done correctly as it will be hidden behind walls later. Think of it as similar to how electricians put wiring in walls before they're closed up. When you see "rough-in experience" in a resume or job posting, it means the person knows how to plan and install these initial plumbing systems.

Examples in Resumes

Completed Rough-In plumbing for 20+ new residential construction projects

Supervised team of 3 plumbers during Rough-In phase of commercial building development

Performed Rough-In installations following local building codes and blueprints

Typical job title: "Plumbers"

Also try searching for:

Plumbing Installer New Construction Plumber Residential Plumber Commercial Plumber Plumbing Technician Apprentice Plumber Journeyman Plumber

Example Interview Questions

Senior Level Questions

Q: How do you plan a rough-in for a large commercial project?

Expected Answer: A senior plumber should explain how they read blueprints, coordinate with other trades, plan material needs, schedule work phases, and ensure code compliance. They should mention experience managing teams and problem-solving on large projects.

Q: What common issues have you encountered during rough-ins and how did you solve them?

Expected Answer: Should discuss experiences with obstacle avoidance, coordination with other trades, dealing with specification changes, and how they've solved these problems while keeping projects on schedule.

Mid Level Questions

Q: What are the key measurements you need to consider during a rough-in?

Expected Answer: Should explain standard measurements for different fixtures like toilets, sinks, and showers, and demonstrate knowledge of local building codes for pipe sizing and placement.

Q: How do you ensure proper venting during a rough-in?

Expected Answer: Should be able to explain basic venting requirements, different types of vents, and how to plan venting systems to prevent plumbing issues.

Junior Level Questions

Q: What tools are essential for rough-in work?

Expected Answer: Should list basic plumbing tools like pipe cutters, measuring tools, levels, and explain their proper use in rough-in work.

Q: What's the difference between rough-in and finish plumbing?

Expected Answer: Should explain that rough-in involves installing hidden pipes and systems before walls are closed, while finish work involves installing visible fixtures and final connections.

Experience Level Indicators

Junior (0-2 years)

  • Basic pipe installation
  • Following measurement guidelines
  • Using basic plumbing tools
  • Understanding building codes

Mid (2-5 years)

  • Reading and following blueprints
  • Planning pipe layouts
  • Code compliance knowledge
  • Problem-solving during installation

Senior (5+ years)

  • Project management
  • Team supervision
  • Complex system design
  • Quality control and inspection

Red Flags to Watch For

  • Unable to read basic blueprints
  • No knowledge of local plumbing codes
  • Lack of experience with different pipe materials
  • Poor understanding of proper measurements and spacing