PPAP

Term from Automotive Manufacturing industry explained for recruiters

PPAP (Production Part Approval Process) is a standardized process used in the automotive industry to make sure new parts meet quality standards before they go into mass production. Think of it as a detailed checklist that suppliers must complete to prove they can consistently make parts that meet all requirements. It's like a quality guarantee system that car manufacturers require from their suppliers. Similar processes include First Article Inspection (FAI) or Initial Sample Inspection Report (ISIR), but PPAP is specifically common in automotive manufacturing.

Examples in Resumes

Led PPAP submissions for 15 new automotive components, achieving 100% approval rate

Managed Production Part Approval Process documentation for major OEM customers

Coordinated cross-functional teams to complete PPAP requirements for new product launches

Typical job title: "Quality Engineers"

Also try searching for:

Quality Engineer Supplier Quality Engineer Quality Assurance Engineer PPAP Coordinator Quality Control Engineer Manufacturing Engineer Process Engineer

Example Interview Questions

Senior Level Questions

Q: How would you handle a PPAP rejection from a major customer?

Expected Answer: Should discuss investigation process, root cause analysis, corrective action plans, timeline management, and strategies for resubmission while maintaining production schedules.

Q: Describe your experience with implementing PPAP procedures across multiple product lines.

Expected Answer: Should explain experience managing multiple PPAPs simultaneously, training teams, standardizing processes, and ensuring consistency across different products and customers.

Mid Level Questions

Q: What are the main elements of a PPAP submission?

Expected Answer: Should mention key components like dimensional results, material certifications, process flow diagrams, control plans, and capability studies, explaining them in basic terms.

Q: How do you ensure all PPAP requirements are met before submission?

Expected Answer: Should discuss checklist usage, review processes, team coordination, and verification steps to ensure complete and accurate submissions.

Junior Level Questions

Q: What is the purpose of PPAP?

Expected Answer: Should explain that PPAP ensures suppliers can consistently produce parts meeting all customer requirements and quality standards.

Q: What are the different PPAP submission levels?

Expected Answer: Should know that there are 5 levels of submission, ranging from Level 1 (warrant only) to Level 5 (complete submission with site audit).

Experience Level Indicators

Junior (0-2 years)

  • Basic understanding of PPAP requirements
  • Ability to collect and organize quality data
  • Knowledge of basic measuring tools
  • Understanding of quality documentation

Mid (2-5 years)

  • Complete PPAP submission management
  • Quality planning and control
  • Problem solving and root cause analysis
  • Customer communication

Senior (5+ years)

  • Advanced quality system management
  • Multi-project PPAP coordination
  • Team leadership and training
  • Strategic quality planning

Red Flags to Watch For

  • No hands-on experience with quality documentation
  • Lack of understanding of measurement systems
  • Poor knowledge of automotive industry standards
  • No experience with quality control tools and software