Lifting Frame

Term from Modular Construction industry explained for recruiters

A Lifting Frame is a specialized piece of equipment used in modular construction to safely lift and position large building sections. Think of it as a heavy-duty metal frame that works like a giant coat hanger, designed to evenly distribute weight when moving prefabricated building modules. Construction teams use these frames because they help prevent damage to modules during transport and installation, making the whole building process safer and more efficient. You might also hear it called a "spreader beam," "lifting beam," or "modular lifting system." It's an essential tool in modern construction methods where building sections are made in factories and then assembled on-site.

Examples in Resumes

Supervised the safe installation of 50+ housing modules using Lifting Frame systems

Certified in operation and safety inspection of Lifting Frames and Spreader Beams

Managed transportation logistics including Lifting Frame setup for modular hospital construction

Typical job title: "Lifting Frame Operators"

Also try searching for:

Modular Construction Specialist Lifting Equipment Operator Construction Equipment Operator Rigging Specialist Crane Operator Module Installation Specialist

Example Interview Questions

Senior Level Questions

Q: How would you plan a complex module lifting operation for a multi-story building?

Expected Answer: Should discuss site assessment, weather considerations, team coordination, safety protocols, equipment inspection, and contingency planning. Should mention experience with different module sizes and weights.

Q: What factors do you consider when selecting the appropriate lifting frame for a project?

Expected Answer: Should explain consideration of module weight, dimensions, center of gravity, site constraints, weather conditions, and safety factors. Should demonstrate knowledge of different frame types and their applications.

Mid Level Questions

Q: What safety checks do you perform before using a lifting frame?

Expected Answer: Should describe visual inspections, load testing, checking certification dates, verifying connection points, and ensuring proper documentation is in place.

Q: How do you handle unexpected situations during a lift?

Expected Answer: Should explain emergency procedures, communication protocols, when to stop operations, and how to assess and respond to changing conditions safely.

Junior Level Questions

Q: What are the basic components of a lifting frame?

Expected Answer: Should identify main beam, connection points, rigging attachments, and safety features. Should show understanding of how these parts work together.

Q: Why are lifting frames important in modular construction?

Expected Answer: Should explain how frames protect modules during lifting, ensure even weight distribution, and improve safety and efficiency of installation.

Experience Level Indicators

Junior (0-2 years)

  • Basic lifting frame operations
  • Safety procedure knowledge
  • Equipment inspection basics
  • Understanding of hand signals

Mid (2-5 years)

  • Complex lift planning
  • Team coordination
  • Problem-solving during operations
  • Multiple frame type experience

Senior (5+ years)

  • Project management
  • Risk assessment
  • Team supervision
  • Advanced lifting strategies

Red Flags to Watch For

  • No formal safety training or certifications
  • Limited knowledge of load calculations
  • Poor understanding of weather impacts on lifting operations
  • Lack of experience with different module types