Intake Structure

Term from Hydroelectric Energy Production industry explained for recruiters

An Intake Structure is a critical part of hydroelectric power plants that controls how water enters the power generation system. Think of it like a carefully designed entrance gate for water. It's the first major structure that water passes through before it can be used to generate electricity. This structure includes various safety features like screens to keep debris out and gates to control water flow. When reviewing resumes in hydroelectric energy, you'll often see this term alongside related concepts like "water conveyance systems" or "hydraulic structures."

Examples in Resumes

Supervised maintenance operations of Intake Structure and debris removal systems

Designed safety improvements for Water Intake systems at three hydroelectric facilities

Led inspection team for annual Intake Structure integrity assessment

Typical job title: "Hydroelectric Engineers"

Also try searching for:

Civil Engineer Hydropower Engineer Structural Engineer Hydraulic Engineer Water Resources Engineer Power Plant Engineer

Example Interview Questions

Senior Level Questions

Q: How would you approach modernizing an aging intake structure while maintaining operations?

Expected Answer: A senior engineer should discuss assessment methods, safety considerations, scheduling around power demands, and strategies to minimize downtime while ensuring structural integrity.

Q: What factors do you consider when designing an intake structure for a new hydroelectric facility?

Expected Answer: Should mention water flow requirements, environmental impacts, debris management, fish protection measures, and how local conditions affect design choices.

Mid Level Questions

Q: What maintenance procedures are essential for intake structures?

Expected Answer: Should describe regular inspections, debris removal, gate maintenance, and monitoring of structural integrity, plus understanding of safety protocols.

Q: How do you ensure environmental compliance at an intake structure?

Expected Answer: Should discuss fish protection measures, water quality monitoring, debris management, and working with environmental regulators.

Junior Level Questions

Q: What are the main components of an intake structure?

Expected Answer: Should be able to identify basic parts like trash racks, gates, screens, and explain their basic functions in water management.

Q: What safety considerations are important when working with intake structures?

Expected Answer: Should demonstrate knowledge of basic safety protocols, personal protective equipment, and understanding of water-related hazards.

Experience Level Indicators

Junior (0-2 years)

  • Basic understanding of hydraulic structures
  • Ability to read engineering drawings
  • Knowledge of safety procedures
  • Assist in routine inspections

Mid (2-5 years)

  • Maintenance planning and execution
  • Problem identification and troubleshooting
  • Environmental compliance knowledge
  • Project coordination

Senior (5+ years)

  • Design and modification of intake structures
  • Risk assessment and management
  • Team leadership and project management
  • Regulatory compliance oversight

Red Flags to Watch For

  • No hands-on experience with hydroelectric facilities
  • Lack of understanding about water safety procedures
  • No knowledge of environmental regulations
  • Limited understanding of structural engineering principles