Factory Testing

Term from Prefabricated Construction industry explained for recruiters

Factory Testing is a quality control process in prefabricated construction where building components are checked and tested in a controlled factory environment before being sent to construction sites. This is different from traditional construction where most testing happens on-site. Think of it like testing a product in a manufacturing plant before shipping it to stores. This approach helps catch problems early, saves time and money, and ensures better quality control since testing happens in a controlled indoor setting rather than outdoors at a construction site.

Examples in Resumes

Supervised Factory Testing of prefabricated wall panels for 50+ residential projects

Implemented new Factory Testing protocols that reduced defect rates by 30%

Managed Factory Testing and Pre-Installation Testing procedures for modular building components

Typical job title: "Factory Testing Specialists"

Also try searching for:

Quality Control Specialist Factory Test Inspector Prefab Testing Coordinator Quality Assurance Specialist Factory Testing Manager Module Testing Specialist Construction Quality Inspector

Example Interview Questions

Senior Level Questions

Q: How would you set up a factory testing program for a new prefab construction facility?

Expected Answer: Should explain process of establishing testing standards, training staff, creating documentation systems, and implementing quality control checkpoints. Should mention coordination between design, production, and site teams.

Q: How do you handle quality issues discovered during factory testing?

Expected Answer: Should discuss problem-solving approach, documentation procedures, communication with production team, implementing corrections, and preventing future issues through process improvements.

Mid Level Questions

Q: What are the key things to check during factory testing of prefabricated units?

Expected Answer: Should mention measurements, material quality, assembly accuracy, finishing details, and functional tests like water tightness or electrical systems where applicable.

Q: How do you document and track factory testing results?

Expected Answer: Should describe use of checklists, photo documentation, reporting systems, and how to maintain records for quality assurance and warranty purposes.

Junior Level Questions

Q: What safety procedures are important during factory testing?

Expected Answer: Should be able to discuss basic safety equipment, proper handling of materials, following testing protocols, and reporting safety concerns.

Q: What basic tools and equipment are used in factory testing?

Expected Answer: Should be familiar with measuring tools, testing equipment, inspection checklists, and basic quality control instruments used in prefab construction.

Experience Level Indicators

Junior (0-2 years)

  • Basic quality inspection procedures
  • Use of measuring tools and equipment
  • Following testing checklists
  • Basic safety protocols

Mid (2-5 years)

  • Detailed quality control procedures
  • Problem identification and resolution
  • Testing documentation management
  • Team coordination

Senior (5+ years)

  • Testing program development
  • Quality system implementation
  • Staff training and supervision
  • Process improvement

Red Flags to Watch For

  • No experience with quality control documentation
  • Unfamiliarity with basic measuring tools
  • Poor attention to detail
  • Lack of safety awareness
  • No understanding of construction materials and methods

Related Terms